H1 6th edition: what changes for insulation

H1/AS1 6th edition took effect on 27 November 2025. It removes the schedule method, and the 5th edition, which still has it, can only be used until 26 November 2026.

The dates

27 November 2025
H1/AS1 6th edition in force. It no longer includes the schedule method.
Until 26 November 2026
The 5th edition, including its schedule method, can still be used.
From 27 November 2026
Only the 6th edition's calculation and modelling methods remain under H1/AS1.

What it means when you choose insulation

Under the schedule method, meeting a minimum R-value for each element was enough. Under the calculation method the designer works out the heat loss of the whole building and compares it with a reference building, so the R-value of each wall, roof and floor build-up matters, not just the batt on its own.

A batt's R-value is for the insulation material. The R-value of the finished wall or roof is lower once framing and the other layers are counted. Your designer or H1 calculation will give the construction R-value each element needs; choose the batt that achieves it in your framing.

How we can help

  • Our H1 design service can do the calculation and specify the insulation and airtight layers together.
  • Ask us for batt sizes to suit your stud or joist centres.
  • Use the estimator to turn your areas into packs and rolls.

The schedule method calculator on this site is for consents lodged under H1/AS1 5th edition before 27 November 2026. For anything later, use the calculation method.

Sources